DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM

0
1080

DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM

 

ABSTRACT

            This project is based on the possible exploration of computer Technology in Today society in market surveying in the daily discharge of duties.

            This project involves the design and development of computerized market survey report analysist.

            The design will enable the user to achieve a desirable report at an increased efficiency, accuracy and speed of doing work and at the same time reduce man – hour repured for piece of work.

            This calls for an alternative method which ie accurate, quick and inexpensive.  This project achieved merit by eliminating all these flows that result from manual operation and present a very accurate, decisive and systematic measure of survey report.

 

TABLE OF CONTENT

CHAPTER ONE

1.0       Introduction

1.1              Background

1.2              Aim or objective of the study

1.3              Statement of the problem or purpose

1.4              Justification of the purpose topic

1.5              Scope of the project

Methodology

Block diagram

Thesis Organization

CHAPTER TWO

LITERATURE REVIEW

CHAPTER FIVE

3.0       overview of the existing system

3.1              Description and analysis of the existing system

3.2              Method of data collection

3.2.1        Interview method

3.2.2        Reference to written text

3.3              Input analysis

3.4              Process analysis

3.5              Output analysis

3.6              Input analysis

3.7              Problem of the existing system

3.8              Justification for the new system

CHAPTER FOUR

4.0              Design for the new system

4.1       Output specification and design

4.2              Input specification and design

4.3              File design

4.4              Procedure chart

4.5              System flowchart

4.6              System requirement

CHAPTER FIVE

Implementation

Program design

Program flowchart

Pseudo code

Source listing

Test-run

CHAPTER SIX

DOCUMENTATION

CHAPTER SEVEN

Recommendation & conclusion

Reference

Appendix (if any)

CHAPTER ONE

1.0       INTRODUCTION

            In order not to embrace hitch in the carrying out of any project, it is necessary to define the objective of the project.  The process surveying enable us to map out the limitation and the delimitation of the project.

            In surveying, we set out the necessary steps and areas that considered to be useful and necessary to implement the objective.

            In this case, we identify the problem, it’s sources, causes and to identify solutions to the problem.

            In the case study of doing these, the objective must be certain.

1.1              BACKGROUND OF THE STUDY

The Background of this study involves indent study of the system report being designed to determine the input data to the report system and how system report objective can be realized.

Data collected or survey made determined the system output and input and grouped into various files (1) Equipment requirement.

EQUIPMENT REQUIREMENT:     To use this report system in survey the following equipment may be needed.

          i)    An IBM or its compatible

         ii)   Magnetic Diskette (3.25 x 5.25 or 35 x 3.5 inches)

        iii)  An IBM line printer or its compatibl

       iv)  A printer interface cable.

Optional equipment:Hard Disk Properly Installed.

MEMORY REQUIREMENT: The design of this system was highly structured by breaking the program in module using Top-Down design technique and loding the program in GW BASIC.  Each program after use call another program from the diskette and pass over the content of relevant variable over to the incoming program by using “COMMON” statement it minimizes effectively the size of primary memory required by the system.

TEST DATA

 The whole system was tested by obtaining survey analysis of previous building project.  Fed the cost of sub-element into the system and compare the output.

DOCUMENTATION

   This system is documented in a way that any one who is not a computer scientist or market surveyor can use it effectively.  The following types of a documentation are implemented.

  1. i)                    Design documentation
  2. ii)                  Operational documentation

        iii)                Test documentation

1.4   OBJECTIVE OF THE PROJECT AIM

Market survey report system has the following objectives

(i)         To give client good value for money

(ii)        To achieve the required balance of expenditure between the various parts of the building

(ii)        To keep expenditure within the amount allowed by the client.

 

DOWNLOAD COMPLETE PROJECT MATERIAL

DESIGN AND IMPLEMENTATION OF A COMPUTERISED MARKET SURVEY REPORTING SYSTEM

Leave a Reply