Joint DOE-PNC research on the use of transparency in support of nuclear nonproliferation

0
317

PNC and LANL collaborated in research on the concept of transparency in nuclear nonproliferation. The research was based on the Action Sheet No. 21, which was signed in February 1996, “The Joint Research on Transparency in Nuclear Nonproliferation“ under the “Agreement between the Power Reactor and Nuclear Fuel Development Corporation of Japan (PNC) and the US Department of Energy (DOE) for Cooperation in Research and Development Concerning Nuclear Material Control and Accounting Measures for Safeguards and Nonproliferation“. The purpose of Action Sheet 21 is to provide a fundamental study on Transparency to clarify the means to improve worldwide acceptability for the nuclear energy from the nuclear nonproliferation point of view. This project consists of independent research and then joint discussion at workshops that address a series of topics and issues in transparency. The activities covered in Action Sheet 21 took place over a period of 18 months. Three workshops were held; the first and the third hosted by PNC in Tokyo, Japan and the second hosted by LANL in Los Alamos, New Mexico, US. The following is a summary of the three workshops. The first workshop addressed the policy environment of transparency. Each side presented its perspective on the following issues: (1) a definition of transparency, (2) reasons for transparency, (3) detailed goals of transparency and (4) obstacles to transparency. The topic of the second workshop was “Development of Transparency Options.“ The activities accomplished were (1) identify type of facilities where transparency might be applied, (2) define criteria for applying transparency, and (3) delineate applicable transparency options. The goal of the third workshop, “Technical Options for Transparency,“ was to (1) identify conceptual options for transparency system design; (2) identify instrumentation, measurement, data collection and data processing options; (3) identify data display options; and (4) identify technical options for reprocessing, enrichment, and MOX fuel fabrication facilities.