Saturday, April 27, 2024

BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS

Building project topics and materials for undergraduate and post graduate students. Research project paper, seminar topics, proposals, titles, ideas and materials are available for dissertation, thesis and essay in Building department. Find below the list of research project topics for Bsc, Msc and Phd Building students.

EFFECT OF LIME-STABILIZATION ON STRENGTH CHARACTERISTICS OF BRICKS

0
EFFECT OF LIME-STABILIZATION ON STRENGTH CHARACTERISTICS OF BRICKS ABSTRACT Clay soils have been used locally in Sokoto to make bricks without stabilizing the soil. The bricks...

EFFECTIVE MATERIAL MANAGEMENT IN BUILDING CONSTRUCTION SITE (RIVERS STATE)

0
EFFECTIVE MATERIAL MANAGEMENT IN BUILDING CONSTRUCTION SITE (RIVERS STATE) CHAPTER ONE INTRODUCTION 1.1   BACKGROUND OF THE STUDY Material management can be defined as a process that...

STRATEGIES FOR CONTROLLING CRACKS IN RESIDENTIAL BUILDINGS IN NIGER SOUTH SENATORIAL...

0
Abstract The study was designed to find out strategies for controlling cracks in residential building, in Niger south senatorial district. Among the specific purposes of...

THE EFFECT OF OSTEOGENESIS ON THE MECHANICAL PROPERTIES OF A 3-D...

0
Abstract: Tissue engineering and regenerative medicine hold great promise for the repair and regeneration of damaged or diseased tissues. Scaffold-based approaches, utilizing biocompatible materials, are...

GROUND WATER CONTAMINATION IN NIGERIA(IMPACT OF SEPTIC TANKS DISTANCES TO WELLS)

0
EFFECT OF GROUND WATER CONTAMINATION IN NIGERIA(IMPACT OF SEPTIC TANKS DISTANCES TO WELLS) ABSTRACT Water is essential for growing food., for household water uses including drinking,...

EVALUATING THE EFFECTIVENESS OF PROJECT DELIVERY METHODS IN SOUTH-EAST NIGERIA

0
ABSTRACT This research studied “evaluating the effectiveness of project delivery methods in South-East Nigeria”. There are alternatives delivery methods for executing a project, the choice...

APPRAISAL OF THE IMPACT OF DELAYS IN PROJECT DELIVERY IN CONSTRUCTION...

0
Abstract Delay is one of the biggest problems often experienced on construction project sites. Delays can instigates negative effects such as increased costs, loss of productivity and...

EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR...

0
EVALUATION OF PROJECT RISK AND THE DETERMINATION OF CONTINGENCY SUM FOR BUILDING DEVELOPMENTS IN NIGERIA ABSTRACT The construction industry is characterised with inherent risk and uncertainties...

CONSTRUCTION OF A WOODEN BOOKSHELF

0
CONSTRUCTION OF A WOODEN BOOKSHELF   Title page Approval page Certification Dedication Acknowledgement Abstract Table of contents List of tables List of figures CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement...

ASSESSMENT OF ERGONOMIC ADAPTABILITY PRACTICES AMONG SELECTED CONSTRUCTION CRAFTSMEN IN ABUJA

0
ABSTRACT Health and safety is about the prevention of ill-health among workers caused by their working conditions. Ergonomics is one of the methods to eliminate...

THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS (A CASE...

0
THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS (A CASE STUDY OF IMO STATE, OWERRI) TITLE PAGE APPROVAL PAGE CERTIFICATION DEDICATION ACKNOWLEDGEMENT ABSTRACT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES CHAPTER ONE: 1.0...

SLUM DEVELOPMENT AND HOUSING NEEDS: A CASE STUDY OF IWAYA SLUM...

0
TABLE OF CONTENTS Title Page i Declaration ii Approval Page iii Dedication iv Abstract vi Table of Contents vii CHAPTER ONE: INTRODUCTION 1.1 Background of the study 1 1.2 Historical background 1.3 Statement of the...

CAUSES AND EFFECTS OF BUILDING FAILURE IN NIGERIA IN LAGOS STATE

0
TABLE OF CONTENTS Title Page                                                                                 i Certification                                                                              ii Dedication                                                                                iii Acknowledgement                                                                    iv Abstract                                                                                    v Table of content                                                                       vii – viii CHAPTER ONE  Introduction Historical Background of the...

ETHICAL IDEOLOGY AND NIGERIAN BUILDING PROFESSIONALS’ AMBIVALENCE TOWARD ETHICAL ISSUES

0
TABLE OF CONTENTS Title Page i Declaration ii Approval Page iii Dedication iv Abstract vi Table of Contents vii CHAPTER ONE: INTRODUCTION 1.1 Background of the study 1 1.2 Historical background 1.3 Statement of the General Problem...

IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUSTRY

0
ABSTRACT This study was based on the importance of incentives in enhancing workers performance on sites, that is, both financial and non-financial incentives, as applicable...

PLACE YOUR ADVERT HERE

ADVERT SPACE HERE !!!

Email: [email protected]

WhatsApp +2348098194677

DISCLAIMER

All undertaking works, records and reports posted on this website, modishproject.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not to duplicate the work in exactly the same words (verbatim). modishproject.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, coursehero and numerous different stages where clients transfer works. The paid membership on modishproject.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348053692035 or send us a mail along with the web address linked to the work, to [email protected]. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 - 48 hours to handle your solicitation.

WhatsApp chat